| Client: |
M/s Engineering Construction International (Pvt.) Ltd. |
| Location |
COMBINED EFFLUENT TREATMENT PLANT KORANGI, KARACHI. |
| Scope of Work: |
(a) Shop Drawings
Shop drawings for primary Sedimentation Tank
Shop drawings for Primary thickener including Sludge scrapers (2 Nos.) and fixed steel bridge structure.
Shop drawings for Secondary thickener including sludge scraper (1 No.) and fixed steel bridge structure.
Study of Pumps layout drawings, Finalizing Equipment location, piping route, Hanger location and interference with civil Electrical and Installation work. Preparation of an Engineering Package suitable for construction. Quality assurance assistant by providing an inspector for Factory test site supervision.
(b) Supply, Fabricate, Install, Test and Commission
Primary Thickener 2 Nos. Fabrication & Erection of Sludge scraper (STI) for primary thickener, shaft, shaft pipes scrapers and their support structure, Agitator pipes, foundation plates, all jointing and Anchoring material, painting / coating and other accessories, complete in all respect with S.S 316-L and Hot Dip Galvanized material.
Fabrication & Erection of Fixed Steel bridge structure for primary sludge thickener, including all super structure components, bridge deck. Railing, inlet drum and its support all Jointing and anchoring material, painting / coatings and other accessories, complete in all respect with ASTM (A-36) material.
(c) Primary Sedimentation Tank
Fabrication & Erection of Sludge scraper (SSI) for primary sedimentation tank including bridge structure with deck and railing scraper and their support structure, scum skimmer, inlet drum and its supports scum removal tray, all jointing and anchoring materials, painting / coating and others accessories, complete in all respect with S.S 316-L and A-36 material.
(d) Secondary Thickener
Fabrication & Erection of Sludge scraper (ST2) for secondary sludge thickener, shaft pipes, scrapers and their support structure, agitator pipes, foundation plate all jointing and anchoring material, painting / coating and other accessories, complete in all respect with stainless steel and hot dip galvanized material.
Fabrication & Erection of fixed steel bride structure for secondary sludge thickener, including all super structure components, bridge deck, railing, inlet drum & its supports all-jointing & anchoring materials, painting / coatings and other accessories, complete in all respect with mild steel material (ASTM A36).
(e) AGITATOR FOR MIXING TANK AG-2.
(f) SUPPLY, FABRICATION, INSTALLATION, TEST AND COMMISSION OF GAS HOLDER.
Providing, Fabrication and installation MS sheet gas holding tank including 50mm relief pipe with 600mm manhole with cover, brackets, all jointing and anchoring materials and other accessories, complete in all respect.
Mild steel (Galvanized) guide pipes including all joining and anchoring materials and other accessories, complete in all respect.
Gas tank guide & bracing structure, including MS sections, all jointing and anchoring and other accessories complete in all respect.
MS sheet including drain pipe, connection with gas inlet and out lets pipe, joining and anchoring materials and other accessories, complete in all respect.
MS grating and frame, on moisture trap housing tank including all jointing and anchoring materials and other accessories complete in all respect.
Galvanizing of M.S work.
(g) Secondary Sedimentation Tank (2 Nos.):
Fabrication & Erection of Sludge scraper (SS2) for secondary sedimentation tank, bridge structure with deck and railing, scrapers, and their support structure, inlet drum and its supports, all joining and anchoring material, coatings & other accessories complete in all respect with S.S 316 L and A-36 material.
Sand Blasting & Painting of M.S Structure.
(h) Erection of Pumps, C.I Pipe Line and Supporting Structure
Installation testing and commissioning of cast iron flanged pressure pipes and fittings (BS 20351966) in including fixing of Gaskets, Nuts, bolts, puddle plates, M.S Section support, hangers, other jointing / anchoring material and accessories, all complete with enamel painting as per requirement of specification and approval of Engineer. The Installation of gate Valve (BS 163) and ball type check valve (BS 1863 & BS 2080) is also included in the complete pipe installation.
Installation, testing & commissioning of all type of pumps including pump motor, pump base, anchor bolts, painting / coating and other accessories, complete in all respect.
(i) Erection & Commissioning
- Agitator (AG-1) 8 Nos.
- Agitator (AG-3) 12 Nos.
- Surface Aerators 8 Nos.
(j) Civil Job
- Core for chemical anchoring with hilti.
- Ø 25 x 175 x 96 nos. for (AG1 & AG3)
- Ø 30 x 250 x 48 nos. for (Aerator)
|
| Year: |
2004 |
|
 |