Client: M/s Pak Suzuki Motors Co Ltd.
Scope Of Work: Location Year
SJ Line Shifting at Welding Shop. (Shutdown Job).

Dismantling and relocation of 8 timers, transformers and spot welding guns and then re-install at new location.

Dismantling of 9 cross beam from existing structure to new location under the hanger.

Dismantling of 10.5 meter long 3 I-beam and to re-install at new location under hanger for cross beam and air hoist traveling. Extend the length of beam from 10.5 to 13 meter for easy main body handling.

Relocation of main body and under body jigs and leveling.

Extend the side railing on proposed hanger for safety purpose up to 15 meter long of same design.

PIPING (SJ LINE)
Get cooling water main connection (supply and return) diameter 65mm from column No. F31. Existing valves will be reused on both lines.

Provide new cooling water piping (supply and return) diameter 50mm and air pipe diameter 40mm around the hanger in U-shape. Over all length of supply water, return water and air are 31, 31 and 31 meter accordingly.

Provide 12 points both sides the hanger, each point consists of supply water, return water and air at 2 meter pitch.

Provide 2 drain point diameter 50 mm with ball valve.

Install one air vent valve (available).

Dismantling the existing piping on proposed hanger.

Re-install the air hoist at new position along with new hose railing and air connection.

SF PANEL DASH (Mechanical work)
Disconnect and re-locate the panel dash two jigs to new positions and connect with air supply (provide new connection)

Dismantle two sets of timers, transformers and spot welding guns and re-install to new position along with cross beam. Re-adjust the centers of hook according to structure.

Disconnect stud welding machine and re-locate to new position and provide new air point for connection.

SF PANEL DASH (Electrical work) Disconnect the timer and transformers and to re-connect from main D.B., timers and transformers (OXS-50 and OX-705).

Disconnect stud welding machine and re=connect to new position from D.B (provide extra wire if required).

CAB BACK SIDE (Mechanical work)
Dismantle and relocate the jigs, timers, transformers and spot welding guns (OXS-33B) to new position and re-connect with air supply. Shifting the cross beam to new position and adjust the centers of hook according to structure design.

Shifting of hemming jig and hemming tool to new location.

CAB BACK SIDE (Electrical work)

Re-connect the timers and transformers of OX-33B.

Provide the electrical point with circuit breakers and receptacles for hemming tool and to re-connect.

SIDE SILL R&L (Electrical)
Re-connect the timer and transformers of UC-1397

FRONT ASS'Y AND RE-SPOT - STV (Mechanical)
Dismantle and shifting of front ass'y jigs, timers, transformers and spot welding guns (4 Nos.) to new position and re-connect with air and water supply. Shift the cross beam to new position and adjust the hook centers according to hanger structure design.

Dismantle and shifting of front ass'y r-spot jigs, timers, transformers and spot welding guns (OXS-73) to new position and re-connect with air and water supply. Shift the cross beam to new position and adjust the hook centers according to hanger structure design.

Front Ass'y And Re-Spot - STV (Electrical)
Re-connect the timer and transformers.

Misc, Electrical Work.
Tube light 14 nos. with hanger & all accessories.

Removal of existing G.I sheets (8’ x 3’) from the truck loading bay and place them at nearby scrap yard by properly stacking them. (554 Nos.)

Installation of new fiber sheets (8’ x 4’) on the existing structure with the help of fixing J-bolts (CS with hot dip galvanized) (500 Nos.)

Supply of 2,000 sets CS hot dip galvanized fixing bolts (J-shaped) in the size as confirmed from site, complete with washer.
Port Qasim,
Karachi.
2003
Installation and Commissioning of new & existing Scrap Conveyor between new and Existing Press Shop.

Unpacking, Shifting inside pit and installation of new scrap conveyor under new tandem line with supply of Hilti rawal bolt size M-12 x 150.

Conveyor Length = 35.115 M

Fabrication of stair and platform for line conveyor motors maintenance.

Supply fabrication of overhead passage on line conveyor with ladders Qty. 2.

Unpacking, Shifting inside pit and installation of new scrap conveyor under new tend line with supply of Hilti rawal bolt size M-12 x 150.

Conveyor Length = 50.3 M

Fabrication of stair and platform for line conveyor motors maintenance.

Supply fabrication of overhead passage on line conveyor with ladders Qty. 2.

Relocation of existing main conveyor from west side (existing building). to east side (out side new building)

Provide steel fabricated platform for maintenance of drive with along with stair.
Port Qasim,
Karachi.
2004
Compressed Air Piping for New Tandem Line

Fabrication, Painting one coat of primer two coat of enamel paint and erection of Air Piping with pipe supports.
Port Qasim,
Karachi.
2004
Fabrication & Installation of Sludge Pit Structure and Equipment for Body Line Extension Project.

Fabrication and Installation of sludge Pit Structure and Equipment for body Line extension project.
Port Qasim,
Karachi.
2004
Installation of pre-inspection area in new paint shop.

Fabrication & Installation of Pre-inspection area in new paint shop.
Port Qasim,
Karachi.
2005